Our medium and long term plan is to build a brand new, modern, purpose-built Men’s Shed building next to the Midmar Village Hall.
For the most up-to-date story please look at our Facebook page HERE.
2025-09-09: The Walls are going up! The first corner is installed …

and a short while later … all finished

2025-09-05: Installing the wall plate and taking delivery of the roof trusses






2025-08-08: Production line wall panel modifications





2025-08-01: Getting started with modifying wall panels


31st July 2025: Collecting donated insulation and wood: one van and four trailers loaded


17-July 2025: All hands to get the concrete poured and levelled on a rather warm day! (oh, and the screeder that we rented didn’t work, so we have to hand screed the wide bit …)





7th July 2025: Installing the DPM/Vapour barrier and the steel mesh


25th June 2025: First pour of concrete








Screeding the concrete
10th – 12th June 2025: Getting the DPM, steel mesh and shuttering done to prepare for the first batch of concrete



06-June 2025: Shifting steel mesh to site



23rd May 2025: Wall panels measured and restacked



14th May 2025: Wall panels delivered



Building up to Ground Level (6th Feb 2024)
On the 6th February 2024 our Shedders brought the foundations up to the floor level of the plan, by laying some impressive brickwork on top of the concrete foundations.






Concrete Foundations
On 16th November 2023 the concrete foundations were poured




Breaking Ground
Initial groundworks started with the clearing and levelling of the proposed site, and installation of a soakaway for drainige.