Building our shed

Our medium and long term plan is to build a brand new, modern, purpose-built Men’s Shed building next to the Midmar Village Hall.


25th June 2025: First pour of concrete

Screeding the concrete


10th – 12th June 2025: Getting the DPM, steel mesh and shuttering done to prepare for the first batch of concrete


06-June 2025: Shifting steel mesh to site


23rd May 2025: Wall panels measured and restacked

Shifting a very small panel

14th May 2025: Wall panels delivered


Building up to Ground Level (6th Feb 2024)

On the 6th February 2024 our Shedders brought the foundations up to the floor level of the plan, by laying some impressive brickwork on top of the concrete foundations.


Concrete Foundations

On 16th November 2023 the concrete foundations were poured

Breaking Ground

Initial groundworks started with the clearing and levelling of the proposed site, and installation of a soakaway for drainige.