Our medium and long term plan is to build a brand new, modern, purpose-built Men’s Shed building next to the Midmar Village Hall.
25th June 2025: First pour of concrete








Screeding the concrete
10th – 12th June 2025: Getting the DPM, steel mesh and shuttering done to prepare for the first batch of concrete



06-June 2025: Shifting steel mesh to site



23rd May 2025: Wall panels measured and restacked



14th May 2025: Wall panels delivered



Building up to Ground Level (6th Feb 2024)
On the 6th February 2024 our Shedders brought the foundations up to the floor level of the plan, by laying some impressive brickwork on top of the concrete foundations.






Concrete Foundations
On 16th November 2023 the concrete foundations were poured




Breaking Ground
Initial groundworks started with the clearing and levelling of the proposed site, and installation of a soakaway for drainige.